案例详情
Case detail

Shunde Ronggui Comprehensive Industrial Park sewage treatment Plant

  • 【Case type】

    Municipal sludge

  • 【Sludge type】

    Comprehensive sludge

  • 【Front-end dehydration mode】

    Mechanical plate and frame pressure filtration dewatering

  • 【Water rate of wet mud】

    55~60%

  • 【Mud production】

    30~50t/d

Project: sewage treatment Plant of Shunde Ronggui Comprehensive Industrial Park. 

Construction time: 2019. 

Sludge type: comprehensive sludge. 

Front-end dehydration mode: mechanical plate and frame pressure filtration dehydration. 

Moisture content of wet sludge: 55% 60%. 

Target moisture content of sludge drying: 300.35%. 

Sludge production: 30~50t/d


COPYRIGHT © 2021 Guangdong Jikang Environmental System Technology Co., Ltd | Copyright statement

Map XML Design:Onedi

亿鸽在线客服系统